NEWS

The results of the first GSE auction as per DM 04/07/2019 (FER Decree) have been published

February 3, 2020 News archive


The results of the first GSE auction as per DM 04/07/2019 (FER Decree) have been published. For the third consecutive time during the last three GSE auctions, one of the PLC group's wind farms is in a qualified position. The plant, located in Castelvetere (BN), with a capacity of 16 MW, is already part of a preliminary agreement with Enel Green Power for the sale and construction.